The Ontario Ministry of Transportation (MTO) has retained Stantec Consulting Ltd. and Dufferin Construction Company to complete the Design-Build (DB) contract for the Class Environmental Assessment (EA), detail design and construction of five Highway 401 structure replacements, Highbury Avenue interchange improvements, and Highway 401 pavement rehabilitation, in the City of London, Middlesex County.

The project is being completed following the MTO Class EA for Provincial Transportation Facilities (2000) for a Group “B” undertaking. Group “B” projects are considered major improvements to existing transportation facilities. This project will include a review of the previously completed Preliminary Design documented in the August 2017 Transportation Environmental Study Report (TESR) for Highway 401, Tributary to Murray Drain Culvert, CNR Overhead and Pond Mills Road Overpass Replacements. This project will also advance the June 2021 Transportation Environmental Study Report (TESR) Addendum for Highway 401 Interchange Reconstruction at Highbury Avenue.

Prior to the start of construction, a Design and Construction Report (DCR) was prepared to further document the scope of work, potential impacts, and mitigation measures. A Notice of Study Completion was issued for the DCR, advising of the start of the 30-day public review period in the London Free Press and L’Action newspapers. All comments were documented and incorporated into the decision-making process. Construction started April 2023.


Version française disponible en composant le 613 722-4420, (Angelo Renon).